top of page
MINE CONSULTING
Forte’s mine optimization model links operations across the entire site to streamline workflows for design, planning and scheduling. The model uses principles of kinetics, hydrodynamics, and diffusion for mine planning which includes design, scheduling, and heap leach configuration to create mine conditions that reduce costs and optimize NPV.
FORTE DIVISIONS
MINE-TO-HEAP
Forte's mine-to-heap optimization model integrates various aspects of mining operations including planning, design, scheduling, metallurgy, comminution, heap leach stacking and modeling, and economic strategies that increase performance and efficiencies for mining clients.
bottom of page